Meadow St- South St. to Rt 90

Meadow St is expected to undergo:

  • Brush cutting
  • Ditching
  • Inspection of cross and driveway culverts
    • Those needing to be replaced or upsized will be

The culvert by Rockport Diner is expected to be upgraded to a box culvert as a part of the Water Crossing bond (approved in 2024 by voters), in the late summer or early fall of 2026.