Warrenton St

All of Warrenton St is expected to undergo:

  • Brush cutting
  • Ditching
  • Inspection of cross and driveway culverts
    • Those needing to be replaced or upsized will be

This scope of work will be completed after the Water Crossing updates and sidewalk changes being completed in April/May of 2026 and will only affect those residents for paving.